DEL Pvt. Limited — Est. 2008 Lahore · 31.5204°N 74.3587°E

Heavy machinery,
precisely built
for Pakistan’s industry.

DEL fabrication shop floor with overhead crane
Shop floor — Manga Raiwind, Lahore 14,000 ft² · 10-tonne overhead crane
0
Years building
0
Plants commissioned
0
Engineers & technicians
0
Industries served
01 / Capabilities

Six things we build, exceptionally well.

Every machine we ship is welded, machined, and tested in-house by engineers we trained ourselves. No outsourcing, no surprise margins — only equipment that runs three shifts, six days a week, for a decade.

Belt conveyor system in factory
CAT-01 — Conveying

Conveyor & bulk handling systems

Belt, roller, screw, and bucket conveyors engineered for cement, grain, and aggregate. Loads up to 1,200 t/h.

View systems →
CNC plasma cutting fabrication
CAT-02 — Fabrication

Heavy steel fabrication

Plate rolling to 40mm, plasma cutting to 6m, certified MIG/TIG welders. Trusses, frames, hoppers, ducting.

View capabilities →
CNC machining metal lathe precision
CAT-03 — Machining

Precision metal processing

CNC turning, milling, and grinding for shafts, gears, dies, and replacement components — tolerances to ±0.02mm.

View output →
Industrial pressure vessel tank fabrication
CAT-04 — Process

Tanks, vessels & reactors

Stainless and carbon-steel storage, mixing, and reaction vessels. Sized 200L–80,000L. ASME-compliant designs.

View vessels →
Industrial automation robotic arm production line
CAT-05 — Automation

Production line automation

PLC-controlled lines, pick & place, vision-guided sorting. Retrofits for existing plants and full greenfield builds.

View systems →
Custom industrial machine engineering workshop
CAT-06 — Custom

Custom-engineered machines

Bring us a process problem; we deliver the machine that solves it — drawings, FAT, installation, and training.

Talk to engineering →
02 / Featured project

Punjab Cement — Line 3 conveyor upgrade.

Replaced a 1990s clinker conveyor with a 1,400m enclosed troughed-belt system across 3 transfer towers. Commissioned in 11 weeks. Zero unplanned downtime since.

Cement plant conveyor system at twilight
Belt length
1,400 m
Throughput
820 t/h
Delivered
11 weeks
03 / Industries

Built for the floors that don't stop.

Pakistan's industry runs on tight margins and tighter schedules. Our equipment is over-built on purpose — because a stopped line costs more than a heavier gearbox.

04 / The DEL way

Six steps, no surprises.

Every machine moves through the same sequence, from a first sketch on the engineer's desk to the moment your operators press start.

  1. 01 / 06

    Discovery

    Site visit, load study, throughput targets — usually within 7 days of inquiry.

  2. 02 / 06

    Engineering

    SolidWorks 3D models, FEA stress checks, stamped GA drawings before a single plate is cut.

  3. 03 / 06

    Fabrication

    Plate prep, plasma cutting, rolling, welding — all in one bay so quality flows with the work.

  4. 04 / 06

    Assembly & FAT

    No machine leaves the floor without a full Factory Acceptance Test against your spec.

  5. 05 / 06

    Installation

    DEL crews handle rigging, alignment, electricals, and commissioning at your site.

  6. 06 / 06

    Service

    5-year warranty on welds, 2-year on motion components, and spares on the same regional shelf as yours.

Full process breakdown
Take the next step

Tell us what your line is missing — we'll engineer it.